Hosted by NewsBreak Local Spotlight — a partner directory of trusted local businesses.
Finished CFS kitchen with white Shaker cabinets, patterned mosaic backsplash, gas range, and hardwood floor.

Kitchen remodeling

The kitchen is the room that has to solve for real life — cooking, homework, gatherings, mail. We design around how you actually use it.

What's included

  • Layout consultation and 2D drawings
  • Cabinet selection, sourcing, and installation
  • Countertop templating and install (quartz, quartzite, granite)
  • Backsplash tile and stone
  • Plumbing rough-in for sinks, dishwashers, and pot-fillers
  • Electrical rework, dedicated circuits, and code-compliant lighting
  • Appliance install and calibration
  • Punch list and warranty walk-through

How the project runs

  1. Site walk. We look at the existing kitchen, discuss what works and what doesn't, and take rough measurements.
  2. Scope & estimate. A written scope with allowances for finishes still being chosen.
  3. Design lock. Cabinets, counters, tile, and fixtures selected. Everything ordered on your approval.
  4. Build. Demolition through finish, typically 4–8 weeks depending on scope.
  5. Punch. Nothing closes out until you're satisfied with the last detail.

Details that matter

Cabinets that stay square

Shimmed, screwed to studs, and scribed to the wall. Doors line up on day one and on day 3,000.

Water-tight counters

Undermount sinks bedded correctly and silicone joints tooled — not just smeared and wiped.

Lighting done in layers

Task, ambient, and accent on separate switches. Under-cabinet strips run continuously, no shadows.

Ready to price out a kitchen?

Free on-site consultation. We'll leave you with a range on the same visit.

Request a consultation